Application of a modern whipstock technology

For the first time on SWG field a modern whipstock technology was used by the company on Platform 13 with rotary rig to sidetrack from existing borehole in order to rectify the failure. The operation was successfully completed with one-run.

FIRST TIME IN AZERBAIJANI DRILLING INDUSTRY

Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR-AQS from Platform 13

read more

Taking of core samples

On SWG field core samples were successfully taken on Platform 13 and 11

read more