Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR AQS from Platform 13. The well was drilled to Fasila Layer, with maximum deviation of 84 degrees. For the first time, a well was put into operation with open end.

FIRST TIME IN AZERBAIJANI DRILLING INDUSTRY

Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR-AQS from Platform 13

read more

Taking of core samples

On SWG field core samples were successfully taken on Platform 13 and 11

read more