Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR AQS from Platform 13. The well was drilled to Fasila Layer, with maximum deviation of 84 degrees. For the first time, a well was put into operation with open end.

FIRST TIME IN AZERBAIJANI DRILLING INDUSTRY

Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR-AQS from Platform 13

read more

Application of a modern whipstock technology

On SWG field a modern whipstock technology was used by the company on Platform 13

read more