Horizontal well

For the first on SWG a horizontal production well (#350) was drilled by SOCAR AQS from Platform 13. The well was drilled to Fasila Layer, with maximum deviation of 84 degrees. For the first time, a well was put into operation with open end.

FIRST TIME IN AZERBAIJANI DRILLING INDUSTRY

Taking of core samples

On SWG field core samples were successfully taken on Platform 13 and 11

read more

Application of a modern whipstock technology

On SWG field a modern whipstock technology was used by the company on Platform 13

read more